燃油改天燃氣燃燒加熱體系

Technical Data ( 手藝人基本參數 )

生物燃料:地埋管自然環境氣 NG

Fuel:NG

熱值: 8500kcal/m3

Calorie Value:8,500kcal/m3

天燃氣美國進口工作壓力Inlet: 350mbar to 1000mbar.

Inlet Gas pressure: 350mbar to 1000mbar

燒嘴電功率: 630Kw /1500Kw 1:10

Burner Capacity: Max 630Kw/ 1500Kw


火爐神器任務溫濕度: Max 780℃

Furnace Temperature: Max 780℃


用途: 熔鋅鋁合金及制熱誕生器

Function: Zinc Pot melt and hot air generator


燒嘴數為: 4 支 (630Kw 2pcs; 1500Kw 2pcs) +所有式的然氣機每臺套






CONTROL PANEL:

放肆柜:

The following control panel will be rack mounted and pre-wired to the gas train:

自力的有節制柜被規劃在如今的地方,具體與如今相應,自帶三套溫暖記實儀, 但是往往靜態接線柱都器終了:

Supply voltage 415/230/1/50Hz

市場出清電流電壓415/230/1/50Hz

Krom//schroeder Flame Safeguard

Krom//schroeder焰火法式風格吃妻上癮器

Krom//schroeder Keyboard/Display Unit, (Flame signal indicator)

Krom//schroeder 內容輸出健盤/顯現出來摸塊(藍色火焰旌旗燈號唆使)

(1) Krom//schroeder l Self-Check UV Scanner

Krom//schroeder UV紫外線火花遙測(帶自查功較)

VX700R color paperless recorder( VX700R型無紙體溫記實儀)

Purge Timer

吹掃定時繼機械

Pilot Interrupt Timer

填埋填埋定時繼電熱器

Power On/Off Switch

電原轉換開關

Burner On/Off push buttons

熔化器啟閉功能鍵

High temperature limit controller with display

低溫環境法式風格控制器(帶數顯壓力表功用)

(1) Type K Thermocouples

J型電偶

Ignition transformer and wire

焚化箱式變壓器及連線

Indicator lights for:

唆使燈顯現出來:

Power on(得電)

Interlocks proven(互鎖它是經過了環節)

Purging(吹掃)

Purge complete 吹掃保持(Ready to start承辦焚化)

Pilot On母火開

Main Burner On自燃器持續運行

Flame Failure Alarm火苗自燃告警

An alarm-fault light reset pushbutton is employed to reset the alarm indicators. An emergency stop push button is also included. These pushbuttons are also door mounted.

帶報案信號唆使的回位控制鍵,來回位報案信號。還含蓋告急停控制鍵。這么多控制鍵都裝置設備在吃妻上癮柜臺板上。

PROCESS AIR FAN INCLUDED

工藝設備羅茨風機

AIR Fan with approximately 3000m3/hr and 9000Pa 3 sets

3套供風速為3000立米米/天,靜壓為7800-9000Pa的抽濾式壓縮機;此中:熔鋅爐多臺燒嘴互用買臺壓縮機 ;

Flanged process air inlet and outlet with companion flanges

國家標準活套法蘭毗連的技術風原產和產品出口

CONSTRUCTION FEATURES:

模塊靜電粉末噴涂事變

All Gas piping painted “Yellow”

不顧一切天燃汽壓縮空氣管-粉末噴涂淡黃色

Rack surfaces and components painted “White”

架裝的外表和引擎-橘紅色

Control Panel enclosure “Power Coating RAL 1008”

放肆柜噴塑日產白

Heater Section painted “Silver”

爐體小面積的-銀粉紅色

DOCUMENTATION:

供貨文件名稱:

System operation manuals will be provided for the skids, which include:

體系中操作參考手冊,包涵:

Electrical schematic pre-wire drawing

電路板圖

Mechanical Drawings

機械安裝圖

Recommended Spare Parts Lists

保舉零部件菜單

Component literature

模塊表

Pipe train test sheets

輸送管測量規模表

PRE- TESTING:

試運前測試圖片

The following pre- tests and inspections will be performed at Job side:

以內試驗和驗證將在現場拆裝終了后查測

All pressure switches will be tested for correct operation using Air, regulated to demonstrate trip point, both rising for high-pressure switches and decreasing for low-pressure switches.

一起重壓觸點開關上市前都將借助學習氛圍停掉打壓測量,

All pressure gauges shall be tested for correct readings.

所有阻力表都顛末打壓檢查并檢定讀數

All safety shut off valves will be tested to confirm proper opening and closing sequences.

不顧一切靈動斷開閥都顛末啟動和關閉舉動各種測試

All control valves will be tested for full range of motion.

一切都是規范閥都顛末全旅程制裁檢測

All wiring and terminals will be checked for proper routing and continuity.

凡事布線和接線鼻子都顛末嚴酷查抄

The entire pipe train will be pressure tested to at least 1.5 times the maximum operating pressure and verified to be leak free.

管線制度顛末打壓檢驗軟件,檢驗軟件學習學習壓力少則為極大任何學習學習壓力1.5倍。